Our ministry leaders are looking for volunteers from their respective ministry groups to claim these tasks and complete them on their time. Below you will see the names of all our leaders who are designating these tasks. If you’d like to contact them, use the “Contact Us” menu tab and let us know you’re ready to help!
Men’s Ministry Assignments – Matt Decker
- Place Concrete in Driveways where they are rutted
- Repair / Replace Sign
- Remove all material and clean up around back shed
- Clean out and organize storage room
- Clear out and move all old trees and move them behind concrete pile
- Clear out property line for overgrowth, fallen trees, and any other debris
Women’s Ministry Assignments – Alicia Harrington / KaRetha Kelley
- Trim Crepe Myrtles
- Weed and Repair Water Fountain
- Clean out and organize all upstairs areas
- Organize pantry area and utilize pantry closet in the kitchen
Young-ish Adult Ministry Assignments – Chris “Chewy” Chrisman
- Spray and Weed-eat around the church
- Pressure Wash Parking Lot
- Stripe Parking Lot and paint bumpers
- Place more crushed limestone in the parking lot
- Finish placing bumpers in the limestone parking lot area
- Wash all A/C Unit Compressors, including in the T-building
- Fit a A/C Filter grill for T1
Y2K Ministry Assignments – Lee Miller
- Paint Columns to match buildings
- Paint Side Entrance Door
- Finish playground including placing rubber mulch
- Fix rubber trim at doors in fellowship hall
- Tape some of the carpet squares
Yardwork Ministry Assignments – Kevin Bolton
- Pressure Wash T-Buildings
- Paint T-Buildings to match main building
- Paint Wood Walkways
- Paint all gutters and metal trim on building
- Fix downspouts, including where the one was removed and is staining the stucco by the fellowship hall entrance door
- Concrete drain where the downspouts enter the limestone parking area
Youth Ministry Assignments – Harris Dickson
- Finish Sheetrock Work in T2
Clean out and organize back area of T2- Fix floor in T2 so that it no longer buckles